Your contract says "5 years comprehensive warranty." Read it again. It almost certainly isn't.
Comprehensive is a marketing word, not a legal one. What actually governs your cooling is a stack of clauses spread across the warranty card, the AMC annexure, and — if you are lucky enough to have one — the service level agreement. Most business owners sign all three without reading any of them, then discover the gaps in the third week of May, when a unit is down and nobody is contractually obliged to show up.
This is a clause-by-clause breakdown of what your cooling vendor actually owes you, what has quietly been excluded, and what to push back on before you sign. We have also built an interactive contract exposure check at the end — seven questions about your current contract that will estimate what those clauses are likely to cost you out of pocket over three years.
01Your warranty is four warranties, not one
The biggest misreading of AC warranty terms in India is treating "warranty" as a single block of coverage. It is four separate promises — compressor, components, refrigerant, and workmanship — each with its own duration, its own exclusion list, and in most contracts, a different party responsible for honouring it.
Compressor warranty — the headline that misleads
Five to ten years — and the number on every proposal. Read it carefully: it usually means the vendor will supply a replacement compressor, not that they will fit it, gas it, or transport it to your premises. On a 2-tonne commercial cassette unit, the labour, refrigerant recharge, and handling around a compressor swap typically runs ₹8,000 to ₹14,000 — more than the cost of the part itself in many cases. A vendor offering a "10-year compressor warranty" who is billing you for the swap is not technically in breach of anything.
PCB, condenser, fan motor — the parts that actually fail
One to five years is the standard range, and parts-only cover is the default structure. Labour is billed per visit at ₹800 to ₹2,000 depending on city and vendor. The PCB — printed circuit board — is statistically the most common failure point in commercial inverter units after the compressor, particularly in high-dust environments like restaurant kitchens and gym floors where thermal cycling and particulate load are intense. A PCB replacement on a commercial inverter unit runs ₹4,500 to ₹9,000 in parts. If labour is not included, add another ₹1,500 to ₹3,000 per callout.
Refrigerant — twelve months, then your problem
Gas leaks are the most common recurring fault in Indian commercial cooling, driven by vibration, poor brazing during installation, and dust-loaded coils that accelerate corrosion. The majority of standard AMC contracts cover refrigerant top-up for the first twelve months, then exclude it entirely. Two recharges over a three-year contract term is a reasonable estimate for a commercial unit in a harsh environment — at ₹2,500 to ₹4,000 per recharge, that is ₹5,000 to ₹8,000 of direct out-of-pocket cost that never appears in the headline AMC price.
Workmanship — the shortest and most fragile
Typically twelve months, and it lapses the moment anyone outside the authorised service network opens the panel — including your own maintenance staff, unless they are explicitly named as permitted in the contract. This clause is also the one that catches most businesses in disputes: routine cleaning by a building maintenance team, a hotel engineer tightening a fitting, or a restaurant manager topping up water in a drain line can all void workmanship cover in a strict reading of standard Indian AMC terms.
"The question isn't how long is the warranty. It is: for each of compressor, PCB, fan motor and refrigerant — is labour included, and for how many years?"
02The warranty says what gets fixed. The SLA says when.
A warranty is a promise about parts. An SLA is a promise about time — and for a running business, time is the expensive variable. A café with a dead cassette unit in June is losing covers whether or not the compressor is technically covered.
Four SLA terms that look solid until you read them carefully.
-
Response time — attendance, not acknowledgment
"4-hour response" can mean the vendor sends you a ticket confirmation email in 4 hours, or that a technician is physically on site in 4 hours. These are very different promises. Insist on on-site attendance, with the clock starting from the moment you log the ticket — not from when the vendor accepts it, allocates it, or calls you back. In most Indian commercial AMCs, response time means acknowledgment. Peak-season on-site attendance for unplanned callouts commonly runs 24 to 72 hours.
-
MTTR — mean time to repair, the number that actually matters
Response time gets someone to your door. MTTR — mean time to repair — is when the unit is working again. The difference matters enormously: a technician can be on site in 4 hours and tell you the part needs to be ordered from a distributor in another city. If MTTR is not written as a number in the contract, it is not a commitment. Ask for it split: on-site resolvable faults (capacitor, cleaning, minor electrical) and faults requiring a part. The latter should have a separate, longer MTTR with a named escalation path if the part is unavailable locally.
-
Uptime guarantee — what 95% actually means in a peak summer
95% uptime sounds strong. It is an allowance for 18.25 days of downtime per year — roughly the entire peak month of May, if a vendor is minded to use the allocation. 98% uptime is about 7.3 days. 99.5% is under 2 days. But the measurement window matters as much as the percentage: annual averaging lets a vendor absorb a fourteen-day peak-summer outage, miss the months your business depends on most, and still hit the yearly target. Push for monthly measurement, and check whether planned maintenance windows are excluded from the calculation — they usually are, and vendors in India often schedule "planned maintenance" during peak demand as a way of reclassifying unplanned failures.
-
Penalties — a preference is not an obligation
An SLA without a penalty schedule is a statement of intent, not a contract obligation. It does not need to be large to be effective — even a ₹500 per-hour-of-overrun credit changes the internal calculus of the vendor's service team, because missing you becomes a visible cost in their system rather than an inconvenience. A vendor who refuses to include any penalty clause for SLA breach has told you something significant about how they prioritise their clients.
95% uptime is not a guarantee. It is an allowance for 18 days a year without cooling — including peak summer.